Hoodies

Varsity hoodie

A slightly oversized 14 oz hoodie with side gussets and a five-needle double stitch.

Choose your configuration

Colour

As MADE lists them for MD703C.

Split by size

These sizes are one production run — one garment, one decoration, one delivery — so they add up to a single committed quantity. Quantities of any other product are counted on their own.

How to split a run across sizes — an even split sells out of the middle and strands the ends.

Totalled from the grid above as soon as you use it. Type it here instead if you have not decided the split yet.

Volume pricing starts at 100 units, with a further step at 500 and a custom production quote at 1,000 and up. What each step changes

Configured price, minimum and delivery are confirmed in your quote.

A production blank, bought direct from MADE and decorated for your run rather than sold plain. Customize it, or order a sample first.

Place your artwork on it — set the size in millimetres and the studio says whether it fits the zone and holds its resolution. Nothing is sent anywhere.

Good product decisions start with clear details.

Fabric and fit

Fit
Slightly oversized
Fabric
80% cotton, 20% polyester; 16 oz 100% cotton 1x1 rib cuffs and waistband
Weight
14 oz
Sizes
XS to 3XL

Decoration and placement

Methods
Confirmed per quote
Placement zones
From the production template

Price and delivery

Price
Request a configured price
Made by
MADE MD703C

What that price is made of, and when it lands

Approve a physical sample before a custom production run.

Committed quantity

Bigger runs, better unit pricing.

The same varsity hoodie costs different money at ten pieces and at a thousand, and it does not fall smoothly — it falls in steps, at these quantities, and each step also changes how the order is placed.

  1. 1–99 units

    Standard price

    Straight to checkout where the product is listed with a price. A custom configuration is quoted.

    Below a hundred, setup is still a large share of every unit, which is the whole of why the price is what it is.

  2. 100–499 units

    5% savings target

    Volume pricing and checkout, for a configuration the approved cost matrix already covers. Anything it does not cover is quoted rather than guessed.

    This is the step that buys you the most: setup has largely amortised and the blank starts hitting supplier price breaks.

  3. 500–999 units

    10% savings target

    Request a bulk quote. Cost, scope, availability and production terms are reviewed before a price is issued.

    A run this size books capacity and commits material, so somebody checks it can be made on the dates you need before quoting it.

  4. 1,000 units and up

    15% savings target

    Custom production quote for your exact quantity and production requirements.

    Priced for the run you are actually placing. Beyond here the unit price keeps falling slowly while the cash and the inventory risk do not.

A target is not a coupon

A savings target is measured against your own standard price for the same specification, and it is conditional on the cost actually falling at that quantity. Where the verified saving is smaller than the target, you are quoted the smaller one — the target is never applied again as a discount on top.

What counts towards the quantity

  • A quantity counts when it can be made in one run: the same garment and supplier route, the same decoration method and specification, the same production window, and the same packing and delivery.
  • Sizes mix freely — 60 medium and 40 large of one shirt is a hundred, and each size keeps its own cost. Colours and multiple artwork versions mix only when the approved costs cover the extra preparation and handling.
  • 60 shirts and 40 unrelated hoodies is a sixty and a forty. They are two runs, and neither reaches the first band.

Why unit cost falls in steps rather than in a line

Which price you are being quoted

Everything here is quoted on the retail path. Approved creator-resellers and brand-resellers are quoted on a trade path instead — the same garments and the same verified costs, calculated at a different margin. They are alternatives rather than a price and a discount, and there is nothing to type at checkout: a trade price belongs to an approved account, and an account that is pending or unapproved is quoted this one.

What trade pricing changes, and what it does not

Before you ask for a number

What the price is made of, and when it lands.

Varsity hoodie is quoted, not listed, because the same garment costs different money at ten pieces and at a thousand. These are the lines a quote separates and what moves each one, so the number you get back is one you can argue with.

  • Blank

    The garment before anything is printed or stitched on it.

    Driven by
    Category, fabric weight and fit — and whether the colour and size curve you want are in stock in the quantity you want.
    With quantity
    Falls in steps at supplier price breaks, not smoothly.
  • Decoration

    The print or the stitch itself, per placement.

    Driven by
    Method and coverage. Screen print is priced per colour, embroidery per stitch, DTG and DTF flat per piece.
    With quantity
    Flat for DTG and DTF. Falls hard for screen print once setup is spread.
  • Setup

    Screens made and aligned, artwork separated, an embroidery design digitised, tooling cut.

    Driven by
    Colour count and placement count. It is the same whether you make ten pieces or ten thousand.
    With quantity
    Fixed per run, so it disappears into the noise as quantity rises. It carries forward to a repeat order.
  • Labels, trims and branding

    Neck labels, woven tags, hangtags, closures — what makes a blank read as your product.

    Driven by
    Whether they are stock or custom. Custom trims have their own minimums and their own tooling.
    With quantity
    Often has a minimum of its own, higher than the garment’s.
  • Packaging

    Polybag, folding, cartons, and any custom box or insert.

    Driven by
    Whether the unboxing is part of the product or the product is simply protected in transit.
    With quantity
    Custom packaging is printed in runs, so it prices like a print job rather than like a garment.
  • Freight and duty

    Getting the finished run from where it is made to where it is needed, and clearing it on arrival.

    Driven by
    Sourcing region, weight, and whether it moves by sea or by air. Duty is set by the destination and the commodity, not by us.
    With quantity
    Per shipment rather than per piece, so a small run carries it badly.
  • Tax

    Quoted separately from the unit price, never folded into it.

    Driven by
    Where the goods are invoiced and delivered. The basis is stated on the quote.
    With quantity
    Applied to the total, so it moves with everything above it.

Every quote states what it assumed

  • How many print or stitch placements are included. A second placement is a second decoration line and, for screen print, a second setup.
  • The quantity and the size curve it was priced at. Both change the blank price and the per-unit share of setup.
  • The date the blank, the freight rate and the duty were sourced. An estimate carries that date; a confirmed quote carries a validity period.

And where the calendar goes.

  1. 01

    Artwork review

    Files checked, separated, digitised for embroidery, positioned and scaled to the real print zone.

    Yours. Clean vector artwork moves through in a day; a logo that has to be redrawn does not.

  2. 02

    Sampling and approval

    A physical sample made, sent, looked at and signed off before anything is run.

    Yours, and it is the single largest source of lost time. Making the sample is quick; waiting for a decision is not.

  3. 03

    Production and finishing

    The run itself, then trims, labels, packing and inspection against the approved sample.

    Ours, and rarely the bottleneck people expect. Curing, dyeing and custom trims have physical dwell time that cannot be bought down.

  4. 04

    Transit

    Freight to the delivery address, and customs clearance on the way.

    The least controllable stage. Sea freight is measured in weeks, air in days at several times the cost, and clearance can only be buffered for.

A production lead time is not a delivered-by promise. Plan backwards from the date the product has to be in hand — the lead-time guide shows how, and the minimums guide covers where setup stops swamping the unit price.